Participant Information
The AME Roundup Core Shack Committee will determine who participates and on which days. Criteria used in the selection process include the project name, commodities and most significant drill intercept reported. Each confirmed company will be required to submit an abstract for the conference Abstract Guide.
With preference given to projects located within the NW Cordillera and reflecting AME Roundup 2026 theme, the Core Shack display includes coverage of:
1, New discoveries – Flag-shipping recent drill intercepts of potential future ore bodies;
2, New geological insights – Emphasising mineral system learnings with implications for targeting and resource growth and/or quality;
3, Resource development transitions – Highlighting significant shifts in project status; and
4, Ore body insights – Illustrating geomodelling, geometallurgical, and processing/recovery advancements.
Selection Process
Selected companies will be formally confirmed to participate via email. Each confirmed participating company will be allocated one display space for two days.
Due to the volume of applications received, if you apply and do not receive a confirmation letter by November 7, 2025, please assume your company was not selected to participate in the Core Shack.
Costs
The booth has no cost, however, we request that companies become AME Corporate Members to experience the full benefits AME membership has to offer.
On-site Booth
All Core Shack booths will include the following:
- one 10’ wide x 10’ deep booth with backwall and sidewall drapery
- two 6’ skirted tables and two fabric chairs
- one 4’x8’ horizontal freestanding poster board
- one LED light
- one 750-watt power outlet
- 24-hour peripheral security
Participating companies will be sent further information on shipping and ordering additional booth space items.